Common Rail Injection Pump

BOSCH CR

Technical condition requirements for removed Common Rail injection pumps

1. The pump housing must not be damaged, strongly corroded or burnt out. 
2. The fixation points and external parts must not be damaged. 
3. No visible signs of pump part removal. 
4. The electrical connections and plugs must not be removed or damaged. 
5. The screw connections must not be damaged.
6. The contact surfaces must not be deformed or damaged. 
7. The manufacturer's / reference number on the body must be legible and comply with the catalogue number. 
8. The goods must be returned in the original packaging (applicable for Bosch only).

Unacceptable examples

No mechanical damages

No mechanical damages


Incomplete / dismantled assembly - unacceptable

Incomplete / dismantled assembly - unacceptable


Missing parts (check valve, end cap) - unacceptable

Missing parts (check valve, end cap) - unacceptable


Damage to the housing - unacceptable

Damage to the housing - unacceptable


Damage to the flange - unacceptable

Damage to the flange - unacceptable


Core must be complete

Core must be complete


Core must be complete

Core must be complete


Surface corrosion of the pump housing - acceptable

Surface corrosion of the pump housing - acceptable


Strong, deep corrosion at the clamping flange - unacceptable

Strong, deep corrosion at the clamping flange - unacceptable


No ZME pressure control valve - acceptable

No ZME pressure control valve - acceptable


Core must be complete

Core must be complete